What's new

Welcome to Free download educational resource and Apps from TUTBB

Join us now to get access to all our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, and so, so much more. It's also quick and totally free, so what are you waiting for?

Practical Time Impact Analysis with Primavera P6

TUTBB

Active member
Joined
Apr 9, 2022
Messages
192,578
Reaction score
20
Points
38
b19ee3d52eb09f1451ba7f21667bb409.webp

Practical Time Impact Analysis with Primavera P6
Published 9/2026
Created by Amir Fazel
MP4 | Video: h264, 1920x1080 | Audio: AAC, 44.1 KHz, 2 Ch
Level: All Levels | Genre: eLearning | Language: English | Duration: 17 Lectures ( 2h 54m ) | Size: 1.5 GB​

Learn P6 delay modeling, critical paths, float, recovery, and analysis when an approved baseline is missing
What you'll learn
⚡ Prepare Time Impact Analyses in Primavera P6 through practical, step-by-step construction delay scenarios.
⚡ Build delay fragnets and integrate them into schedules while preserving logic, calendars, and actual progress.
⚡ Measure how delays affect critical paths, available float, key milestones, and project completion.
⚡ Model design approval delays, restricted site access, long-lead procurement, and missed outage windows.
⚡ Analyze interacting owner and contractor delays and avoid double-counting their effects.
⚡ Track delay impacts across schedule updates and evaluate mitigation, recovery, and remaining delay.
⚡ Evaluate missing or unreliable baselines and develop documented reference models with clear limitations.
⚡ Compare TIA, windows, as-planned versus as-built, impacted as-planned, and collapsed as-built methods.
⚡ Prepare a structured delay-analysis report linking events, schedule results, supporting records, and assumptions.
Requirements
❗ Basic understanding of construction schedules, critical paths, and activity relationships.
❗ Basic familiarity with Primavera P6, including activities, calendars, and schedule updates.
❗ Access to Primavera P6 Professional to complete the hands-on exercises.
❗ No previous experience preparing Time Impact Analyses is required.
Description
This course contains the use of artificial intelligence.
Learn how to assess construction delays and prepare practical Time Impact Analyses using Primavera P6.
This course follows a fictional reference project through practical delay scenarios, helping you understand how events affect schedule logic, available float, critical paths, milestones, and project completion. Step-by-step demonstrations connect the modeling process with the reasoning behind each change.
You will explore design approval delays, restricted site access, long-lead procurement, missed outage windows, existing contractor delays, and interacting owner and contractor events. You will learn to build delay fragnets, select an appropriate reference schedule, preserve actual progress, and compare results without double-counting impacts.
A dedicated module addresses a common challenge: working without a credible approved baseline. You will examine schedule reliability, document deficiencies, develop a provisional reference model, and explain the assumptions and limitations affecting your conclusions.
The course also covers mitigation and recovery, multiple events across schedule updates, changing critical paths, and comparisons with other delay-analysis methods. These include as-planned versus as-built, impacted as-planned, collapsed as-built, and windows analysis.
Supporting exercises help you connect delay events with schedule evidence and prepare clear explanations of the modeled results. The emphasis is on understanding why dates change and how to communicate those changes.
This course is intended for schedulers, planning engineers, project controls professionals, project managers, and professionals developing construction claims expertise. Basic knowledge of CPM scheduling and Primavera P6 is recommended.
AI assistance disclosure: AI tools helped develop written explanations, presentation materials, fictional practice scenarios, and supporting resources. The examples are educational; applying these methods to actual projects requires checking the schedule inputs, project records, assumptions, and calculated results.
Who this course is for
⭐ Planning engineers, schedulers, and project controls professionals who want practical delay-analysis skills.
⭐ Project and construction managers who need to understand schedule impacts and evaluate recovery options.
⭐ Claims consultants and contract administrators who review delay events and supporting schedule evidence.
⭐ Contractor, consultant, and owner representatives who prepare or assess Time Impact Analyses.
⭐ Professionals seeking to move from scheduling into construction delay analysis and claims consulting.
Homepage
Code:
https://www.udemy.com/course/practical-time-impact-analysis-with-primavera-p6

Recommend Download Link Hight Speed | Please Say Thanks Keep Topic Live
No Password - Links are Interchangeable
 
Top Bottom